When Should You Plan a Spring Kitchen Remodel?

Want a new kitchen before spring gatherings? Here's when to start, what to decide first, and how the timeline actually works backward from your move-in date.

When Should You Plan a Spring Kitchen Remodel?

November 13, 2026

White Shaker kitchen with granite counters, range hood, and under-cabinet lighting in Mount Pleasant, SC Kitchen with granite island, pendant lights, and stainless double ovens in Summerville, SC
Finished kitchen remodels · Mount Pleasant and Summerville, SC.

Short answer: To have a new kitchen by spring, start the design conversation in December or January. A full kitchen remodel takes about 5–8 weeks from the first in-home consult to the final walk-through: roughly a week for 3D design and quote, 2–6 weeks for cabinets to ship depending on the line, and 3–5 weeks of on-site work. Starting early also gives you time to make every decision before anything is ordered.

How Does the Timeline Work Backward From Spring?

  1. Consult (about 1 hour). Free in-home measure and conversation.
  2. Design and quote (about a week). 3D rendering and itemized pricing.
  3. Cabinet ordering (2–6 weeks). KCD and DL typically ship in 2–4 weeks; GHI in 4–6.
  4. On-site work (3–5 weeks). Demo, install, trim, counters, punch list.

Add a little cushion for decision-making and countertop fabrication, and a January start comfortably lands a finished kitchen before spring.

Why Plan Over the Holidays?

  • You'll see exactly what isn't working while you're cooking for a crowd — write it down.
  • Design decisions take time, and they go better without a deadline breathing down your neck.
  • Getting on the schedule early gives you more choice of install dates.

What Should You Decide First?

  1. Scope: a cabinet-only swap ($8,000–$15,000, 3–5 days) or a full remodel ($25,000–$60,000, 3–5 weeks)?
  2. Layout: keep it or change it?
  3. Cabinet line: KCD, DL Cabinetry, or GHI — each with different styles and lead times.
  4. Countertops and backsplash, so they're ready right after cabinets go in.
  5. Appliances, so cabinets are designed around the exact models.

What If Your Kitchen Has Bigger Changes Planned?

High-end projects with wall removals or island additions run 6–10 weeks on-site, so start even earlier. If you live in a historic district and your project touches the exterior, read our guide to BAR reviews for historic kitchen remodels.

Frequently Asked Questions

Is winter a good time to remodel a kitchen?

It's a great time to plan. Design, selections, and ordering can all happen in winter, so on-site work starts as soon as cabinets arrive.

Can I lock in an install date now?

We lock install dates as cabinets arrive. Starting the design early puts you first in line.

What do I need for the first consult?

Just your kitchen and your list of what's not working. Photos of kitchens you like help too.

Charleston Kitchen and Bath Services serves Ladson and the Tri-County from our North Charleston showroom — factory-direct cabinets and our own install crew since 1990. Learn more on our kitchen remodeling page.

Rated 5.0 on Google & Houzz · Free in-home measure and 3D design · Mon–Sat, 8 AM–6 PM · 843-406-3132

Start planning — book a free consult →