October 10, 2026
Short answer: A bathroom remodel in Mount Pleasant, SC costs $2,500 to $5,000 for a vanity swap with a new top and sink, $12,000 to $30,000 for a mid-range full bathroom remodel, and $40,000 to $90,000+ for a primary-suite gut renovation. Vanity swaps take 1–3 days, full baths 2–4 weeks on-site, and primary suites 5–8 weeks.
What Does Each Level of Bathroom Remodel Include?
| Project | Typical cost | On-site time |
|---|---|---|
| Vanity swap — new vanity, top, and sink | $2,500–$5,000 | 1–3 days |
| Full bathroom remodel — vanity, tile, fixtures, shower | $12,000–$30,000 | 2–4 weeks |
| Primary-suite gut renovation — curbless shower, freestanding tub, double vanity | $40,000–$90,000+ | 5–8 weeks |
What's Included in a Full Bathroom Remodel?
- Vanity design — single, double, floating, or furniture-style — sourced factory-direct from KCD, DL Cabinetry, or GHI
- Tile, shower glass, and plumbing fixture coordination
- Moisture-tolerant finishes chosen for Charleston humidity
- Properly sized exhaust ventilation (80–150 CFM) vented outside
- Subfloor repair where moisture has caused damage
- Licensed plumbing and electrical work
- ADA-compliant options on request
- A 1-year workmanship warranty
See the full scope on our bathroom remodeling page.
What Drives the Cost of a Bathroom Remodel?
- Moving plumbing. Relocating a toilet, shower, or vanity adds the most cost.
- Shower type. A curbless walk-in shower needs more floor work and waterproofing than a standard curbed shower.
- Tile choice and coverage. Floor-to-ceiling tile costs more than a tiled shower with painted walls.
- Hidden damage. Humidity and slow leaks can rot subfloors in older Lowcountry homes — that gets fixed before new tile goes down.
Is a Vanity Swap Worth It?
If your shower and tile are in good shape and the vanity is the eyesore, yes. A new vanity, top, and sink can change the look of a bathroom in a day or two at a fraction of a full remodel. Choose a vanity built for humidity — plywood boxes and sealed finishes hold up far better than particleboard here.
Frequently Asked Questions
How long will my bathroom be out of use?
A vanity swap takes 1–3 days. A full bathroom remodel runs 2–4 weeks on-site, and a primary-suite gut renovation takes 5–8 weeks. If it's your only bathroom, plan for that window before work starts.
Do you handle permits?
Yes. We coordinate permits and scheduling as part of the project once you approve the design and quote.
Do you offer accessible bathroom options?
Yes — ADA-compliant options like curbless showers are available. We'll walk through them at the free measure.
Charleston Kitchen and Bath Services has remodeled bathrooms in Mount Pleasant and across the Tri-County since 1990, with our own in-house crew.
Rated 5.0 on Google & Houzz · Free in-home measure · Mon–Sat, 8 AM–6 PM · 843-406-3132
Last updated: October 2026

